Manufacturing Process

How we manufacture transformers, stage by stage.

From core steel to a tested, despatch-ready unit the stages every power and distribution transformer goes through at our Surat, Gujarat works.

Inquire Us
Power transformer on the Mekalasuta factory floor

1. Enquiry & Specification Review

Focus

Duty & Loading · Site Conditions · Switchgear Rating

Enquiry and specification review at the Mekalasuta works

Duty, loading, site conditions and downstream switchgear are reviewed before quoting, so the design starts from the right rating, not just the nameplate that was asked for.

Key Points

  • Duty and loading confirmed before design begins
  • Site and switchgear conditions checked
  • Specification issues flagged before quoting, not after

2. Electrical & Mechanical Design

Focus

Core & Winding · Cooling · Tank Design

Transformer general arrangement drawing

Core, winding, cooling and tank are designed to the agreed losses, impedance and short-circuit duty, with drawings issued for approval where the order requires it.

Key Points

  • Design matched to agreed losses and impedance
  • Short-circuit duty accounted for at the design stage
  • Drawings issued for customer approval

3. Material Inspection

Focus

Core Steel · Conductor · Insulation & Oil

Copper winding conductor and insulation

Incoming core steel, conductor, insulation and oil are checked against specification before they go anywhere near the shop floor.

Key Points

  • Incoming materials checked against specification
  • Core steel and conductor verified on arrival
  • Insulation and oil quality confirmed before use

4. Core Building

Focus

CRGO Steel · Step-Lapping · Precision Stacking

Coils being formed on a winding machine

Grain-oriented silicon steel is cut and mitred at the joints, then step-lapped and stacked to a jig, the stage that decides the no-load loss figure paid for the life of the transformer.

Key Points

  • CRGO steel cut, mitred and step-lapped
  • Laminations stacked to a jig and clamped
  • Determines no-load loss for the transformer’s life

5. Winding

Focus

Copper / Aluminium · Paper Insulation · Coil Forming

Wound transformer coils on the core

HV and LV windings are wound to design, with construction and conductor matched to the current, voltage and short-circuit duty the unit has to withstand.

Key Points

  • Winding construction matched to current and voltage
  • Paper-covered copper or aluminium conductor
  • Duct placement planned to limit stray losses

6–7. Assembly, Tanking & Oil Filling

Focus

Drying · Tank Fabrication · Oil Filling

Core and coil assembly inside an oil-filled tank

Wound coils are fitted to the core and dried to remove moisture, then tanked in a leak-tested, painted enclosure and filled with dielectric-grade mineral oil.

Key Points

  • Assembly dried to remove moisture before oil filling
  • Tank leak-tested and painted to the specified system
  • Oil chosen for dielectric strength and cooling

8. Testing & Dispatch

Focus

Routine Tests · Documentation · Packing

Transformer test panel Crated transformer being loaded onto a truck for dispatch

Every unit undergoes a full routine test set before despatch, documented and witnessed by the customer on request, then packed with its documentation pack.

Key Points

  • Full routine test set completed on every unit
  • Customer witness testing available on request
  • Despatched with a full documentation pack

Transformer manufacturing is a sequence of hold points, not a single production line: core building, winding, core-coil assembly, tanking, insulation and oil filling, and testing each have to be right before the next stage starts, because a fault caught after despatch costs far more than one caught on the shop floor. This page walks through how Mekalasuta Power Transformer builds power transformers, distribution transformers and dry type units at our facility in Surat, Gujarat, stage by stage.

Call or WhatsApp for anything urgent; for a new order or a routine enquiry, the form above or a direct email works just as well. Either way, the more you can tell us about the duty, the site and the timeline, the more useful the first reply back will be.

Certification

ISO 9001:2015

Service team

In-house, Surat

Works on

All makes, not only ours

Service lines

Repair · AMC · Rental · Oil

Shop Floor

Machinery and capability

Core cutting, winding, tank fabrication, drying, oil filling and testing are all carried out in-house at the Surat facility.

Inquire Now
Engineers working on a transformer control cabinet

FAQs

Frequently Asked Questions

Industrial manufacturing hall
What are the main stages of transformer manufacturing?

Specification review, electrical and mechanical design, material inspection, core building, winding, core-coil assembly and drying, tanking and oil filling, and finally testing and despatch.

What type of steel is used in a transformer core?

Grain-oriented silicon steel (CRGO), cut and step-lapped to reduce no-load loss. It is the standard core material across the industry for power and distribution transformers.

Copper or aluminium winding — which is better?

Neither is universally better; it depends on the application. Copper has lower resistance for a given cross-section, which matters more on some duty cycles than others. We wind in either material to specification.

What tests does a transformer undergo before despatch?

A standard routine test set: winding resistance, turns ratio, no-load loss, load loss, impedance voltage, insulation resistance, dielectric withstand and tank leak testing. See our certifications page for the full list.

What is the difference between type tests and routine tests?

Routine tests are carried out on every unit before despatch. Type tests (temperature rise, impulse, short-circuit withstand) verify a design rather than an individual unit, and are typically carried out at an accredited independent test laboratory.

Can customers witness testing before despatch?

Yes. Routine tests can be witnessed at works, and customers are welcome to visit during the build.

How long does manufacturing take from order to despatch?

It depends on rating and current shop loading, so we quote a timeline with the price rather than a standard figure.

Get in touch

Discuss your industrial equipment needs.

Tell us about your project and our engineering team will help you identify the right equipment or custom solution.

  • Power Transformers
  • Distribution Transformers
  • Dry Type Transformers
  • Cast Resin Transformers
  • Package Substations
  • IDT Solar Transformers
  • Ring Main Units
  • Turnkey Projects
  • Repair & AMC