Power
Transformer
- Cooling: ONAN / ONAF
- Winding: Copper or aluminium
Three-phase power transformers for substations, generating stations and large industrial intake, built to your single-line diagram.
Renewables
Inverter duty transformers (IDT) for solar and wind plants, designed around a duty cycle that swings every day and harmonic loading from the inverter.
Product Overview
A solar step-up transformer is energised at dawn, ramps to full load by midday, backs off through the afternoon and sits at no load all night — every day for twenty-five years. That is a very different thermal and mechanical life from a substation unit that runs flat, and the inverter's harmonic output adds a loading pattern a standard design does not allow for.
Inverter duty transformer (IDT) design means low no-load loss, because the unit spends a lot of its life idling, and tolerance of the harmonic content the inverter puts out. For plants at remote sites we also specify the tank and paint system for the actual environment — desert dust and coastal salt are not the same problem — and enclosures are corrosion-resistant for unattended outdoor duty.
Ratings are built to order. Tell us the duty and we will confirm what is achievable.
Single-phase or three-phase
Single, dual or split
ISO 9001:2015
In-house, Surat
Frequently Asked Questions
An inverter-duty transformer is designed to handle the harmonic content and switching ripple produced by solar or wind inverters, which a standard distribution transformer is not optimised for. Core and winding design account for the additional harmonic loading so the unit does not overheat or lose life prematurely under that duty.
Inverter output carries harmonic frequencies well above the fundamental, which increase eddy-current and stray losses in a transformer not designed for it. An inverter-duty design accounts for this in the core and winding to avoid excess heating and reduced service life.
Off-circuit tap switches are common, since solar and wind plants usually need only occasional voltage adjustment rather than continuous under-load correction. Confirm your grid connection requirement with us and we will recommend the right tap arrangement.
The fundamentals are the same — oil, breather, terminations and thermal monitoring — though duty cycles tied to daily generation patterns are worth factoring into your inspection interval. See our general maintenance schedule as a starting point.
Get in touch
Tell us about your project and our engineering team will help you identify the right equipment or custom solution.