Three-phase power transformers for substations, generating stations and large industrial intake, built to your single-line diagram.
Project execution
End-to-end substation and distribution project execution — design, supply, erection, testing and commissioning under one point of accountability.
Product Overview
A substation or distribution project usually involves more suppliers than it needs to: a transformer vendor, a switchgear vendor, a civil contractor and an erection crew, each accountable for their own piece and nobody accountable for the whole. Taking a project on turnkey basis puts design, supply, installation and commissioning under one contract and one point of contact.
Scope typically covers design and engineering of the substation or distribution scheme, procurement and supply of the transformer, switchgear and associated equipment, erection and civil coordination on site, testing and commissioning, and handover with as-built documentation and operator training. We scope each project against the customer's load study and site conditions rather than a standard package.
Ratings are built to order. Tell us the duty and we will confirm what is achievable.
Design, supply, erection, commissioning
Substation and distribution infrastructure
ISO 9001:2015
In-house, Surat
Frequently Asked Questions
Design review against your single-line diagram, manufacture of the transformer and associated equipment, transport, site installation, commissioning and handover testing — coordinated as one project under one point of contact rather than separate suppliers for each stage.
Civil and foundation work is typically coordinated with your site contractor rather than executed by us directly; the electrical scope — equipment, installation and commissioning — is what we deliver as principal contractor. Tell us your project structure and we will confirm the split of responsibility.
One point of accountability for design, supply, installation and commissioning removes the finger-pointing that happens when equipment and installation come from different vendors and something does not line up on site.
Your single-line diagram, site layout, target energisation date and any civil constraints already fixed. Send what you have through the enquiry form and our engineering team will confirm scope and a realistic programme.
Get in touch
Tell us about your project and our engineering team will help you identify the right equipment or custom solution.