Power
Transformer
- Cooling: ONAN / ONAF
- Winding: Copper or aluminium
Oil-immersed
Three-phase power transformers for substations, generating stations and large industrial intake, built to your single-line diagram.
Product Overview
Power transformers sit at the point where transmission voltage becomes usable distribution voltage — utility substations, generating stations, and large industrial intakes. As a power transformer manufacturer, we build every unit against the customer's own specification rather than off a shelf, because the losses, impedance and tap range that suit one network rarely suit the next.
Core assembly uses grain-oriented silicon steel, mitred and step-lapped to hold no-load losses down. Windings — copper or aluminium — are wound in-house so conductor selection, duct placement and clamping can be matched to the short-circuit duty the unit will actually see. Tanks are fabricated, pressure-tested and finished on the same premises, with protective fittings (Buchholz relay, oil and winding temperature indicators, magnetic oil level gauge) fitted per the agreed design.
Ratings are built to order. Tell us the duty and we will confirm what is achievable.
ONAN / ONAF
Copper or aluminium
ISO 9001:2015
In-house, Surat
Frequently Asked Questions
Power transformers handle bulk transmission-to-distribution or generation step-up duty at higher ratings, typically inside a substation. Distribution transformers sit further downstream, stepping voltage down again for feeders and end consumers. The core and tank construction principles are similar; the difference is in duty, rating and how the loss and impedance figures are optimised.
Most units are supplied ONAN (oil natural, air natural) or ONAN/ONAF (with fans for a forced-air rating step). The right class depends on ambient temperature at site and how close to nameplate the transformer will run for sustained periods — tell us the duty and we will recommend a class.
Yes — OLTC is available where the network needs voltage correction under load rather than during a planned outage. See our note on choosing between off-circuit and on-load tap changers if you are not sure which your application needs.
Lead time depends on the rating, voltage class and current order load at the works, so we do not quote a standard figure here. Send your specification through the enquiry form and we will confirm an honest delivery timeline with the quotation.
Get in touch
Tell us about your project and our engineering team will help you identify the right equipment or custom solution.