Introduction
A transformer's turns ratio is fixed at manufacture, but the voltage on the network it is connected to is not. Tap changers exist to correct for that drift — and the type you need depends entirely on how often the correction has to happen while the transformer stays energised.
Off-circuit tap changers
An off-circuit (or “de-energised”) tap changer can only be operated with the transformer switched off and isolated. It is a simple, robust mechanism — usually a rotary switch inside the tank, set by hand to one of a small number of fixed positions, typically ±5% in steps of 2.5%.
This suits installations where the supply voltage is stable and any correction needed is a one-off, done at commissioning or after a rare, planned change to the network upstream — not something that needs adjusting while the transformer is running.
On-load tap changers (OLTC)
An on-load tap changer does the same job, but while the transformer stays energised and carrying load. It is mechanically more complex — a diverter switch or selector mechanism has to move between tap positions without ever momentarily open-circuiting the winding — and it costs more, both to buy and to maintain, since it is a moving part that sees continuous duty over the transformer's life.
OLTC is the right call where voltage genuinely varies through the day: a long rural feeder with a big swing between light and peak load, or a substation where the incoming grid voltage itself moves around. Utility substations use OLTC as standard for exactly this reason.
Getting the choice wrong
An off-circuit tap changer on a feeder with real daily voltage swing means someone has to schedule an outage every time it needs adjusting — in practice, it usually just does not get adjusted, and downstream equipment lives with the wrong voltage indefinitely. An OLTC on a stable supply is money spent on a maintenance liability the site will never actually use.
What to tell us
- Whether the incoming supply voltage is stable or known to vary through the day
- How the transformer will be operated — is there someone who can schedule an outage for a tap change, or does it need to happen live
- The tap range required, if you already know it from a load study
Tell us the duty and we will recommend the right type rather than default to whichever is cheaper.